PROCESS PLANTS
Playmobil Malta Ltd
Provision and installation of processing system, HVAC, service water system and compressed air of in Playmobil’s new extension building. Coordination between subcontractors of and work site. Study and Engineering detailed of hanging system and distribution in the whole of all plant.
Role
Subcontractor Polidano
Location
Hal Far (BBG), Malta
Type
Process plant in the new production site
SRT Project Hangar
Detailed design and construction of the domestic hot and cold water system, HVAC system, aeraulic system with P3 channels, compressed air system and fire fighting room complete with hydraulic distribution and self-extinguishing systems inside the building. Development and construction of the waste oil collection system inside the Hangar.
Role
FM Core Subcontractor
Location
Luqa (LQA), Malta
Type
New Hangar process plant
Pirelli Spa
Installation of the entire mechanical, electrical, fire fighting system and HVAC plant for the new AHU in the new chemical dousing room at Pirelli production site in Settimo Torinese (TO). Basic and detailed engineering study to support technicians, optimizing the limited space available. Management and control of the HVAC and elec- trical system with dedicated software.
Role
Main Contractor
Location
Settimo Torinese (TO), Italy
Type
Process plant in the new Powder Room department
Mater Dei Hospital
Engineering study and construction of structures to support n.14 chillers installed on the roof of the Mater Dei hospital in Malta. Prefabrication and installation of carbon steel piping to serve the chillers, and connection to the main distri- bution system. All the new pipes were insulated with armaflex and finished in aluminum.
Role
Subcontractor FM Core
Location
Msida (MSD), Malta
Type
Revamping Chillesr plants
Promochimica Ltd
Provision and installation of new processing system, at Promochimica site in Beja (Tunisia), thanks to a de- tailed engineering study, supplying everything that al- lows the correct operating principles of plants including insulation of pipes and tanks, also indicating the nature and sense type of the transported fluids. Work included assistance, maintenance and final test, logis- tic management of materials and equipment at work site.